BioMGT
In the BIOMGT project funded by the Wallonia Region and the European Union structural funds, MITIS and its partners ANATIS and Biogaz du Haut-Geer are developing a pilot unit plant. This pilot is a biomethanisation system installed in a farm located in Durbuy (Belgium) integrating ANATIS technologies and coupled to a co-genereration microturbine developed by MITIS.
Date
On 01/01/20
Type
Research project
Status
Finished
More information
The control unit of the microturbine monitors and operates the whole ANATIS systems including pumps, sensors, et cetera. The heat which is produced by the cogeneration is directly used to heat the anaerodigesters (ensuring the bacterial action) and the farm’s building while the electricity is used by the farm or fed to the grid.
Host(s)
3 profile(s) associated to this action.
ANATIS
We install complete bio-methanation installation with CHP unit from 5kW to more than 1000kW electrical.
Pl. St Jacques 11, 4000 Liège, Belgique
Last updated: 12/08/2024
MITIS
Micro CHP systems, heat exchangers and combustion chambers.
Last updated: 24/06/2024
Biogaz du Haut Geer
Biomass harvesting, biogas production, biogas cogeneration.
Rue du Pont 18, 4253 Administration communale de Geer, Belgique
Last updated: 09/02/2024